Filters
Collection
840 Results
-
Wampo (Wang Po), Thailand. 21 October 1945. A diesel rail car passing over the long trestle ...
Photograph
Maker: Reddaway, Bruce Albert
Wampo (Wang Po), Thailand. 21 October 1945. A diesel rail car passing over the long trestle bridge commonly known as the Wampo viaduct. This tiered viaduct was built along the edge of the Kwai Noi riv...122323
-
WAU-LABU, NEW GUINEA, 1945-12-13. BLAKES BRIDGE, A NEW SUSPENSION BRIDGE BUILT BY MEMBERS OF 8 ...
Photograph
WAU-LABU, NEW GUINEA, 1945-12-13. BLAKES BRIDGE, A NEW SUSPENSION BRIDGE BUILT BY MEMBERS OF 8 MECHANICAL EQUIPMENT COMPANY OVER THE SNAKE RIVER.099380
-
WAU - LAE ROAD, NEW GUINEA, 1944-02-26. A CULVERT THIRTY-ONE AND A HALF MILES FROM WAU THAT ...
Photograph
WAU - LAE ROAD, NEW GUINEA, 1944-02-26. A CULVERT THIRTY-ONE AND A HALF MILES FROM WAU THAT REPLACES A BRIDGE AT THIS POINT IN THE ROAD. THIS SECTION IS MAINTAINED BY THE 1ST MECHANICAL EQUIPMENT PLAT...070909
-
WAU - LAE ROAD, NEW GUINEA, 1944-02-26. A MONTH OLD STEEL GIRDER BRIDGE ACROSS BANDA CREEK ...
Photograph
WAU - LAE ROAD, NEW GUINEA, 1944-02-26. A MONTH OLD STEEL GIRDER BRIDGE ACROSS BANDA CREEK CONSTRUCTED BY MEMBERS OF THE 1ST MECHANICAL EQUIPMENT PLATOON, 2/1ST RAILWAY CONSTRUCTION COMPANY (MECHANICA...070893
-
WAU - LAE ROAD, NEW GUINEA, 1944-02-20. A SUSPENSION BRIDGE BUILT BY AUSTRALIAN ARMY ENGINEERS ...
Photograph
WAU - LAE ROAD, NEW GUINEA, 1944-02-20. A SUSPENSION BRIDGE BUILT BY AUSTRALIAN ARMY ENGINEERS ACROSS THE BULOLO RIVER SIX AND A HALF MILES FROM WAU. IT REPLACES A BRIDGE LDESTROYED BY AUSTRALIAN COMM...070852
-
WAU - LAE ROAD, NEW GUINEA, 1944-02-20. A SUSPENSION BRIDGE BUILT BY AUSTRALIAN ARMY ENGINEERS ...
Photograph
WAU - LAE ROAD, NEW GUINEA, 1944-02-20. A SUSPENSION BRIDGE BUILT BY AUSTRALIAN ARMY ENGINEERS ACROSS THE BULOLO RIVER SIX AND A HALF MILES FROM WAU. IT REPLACES A BRIDGE DESTROYED BY AUSTRALIAN COMMA...070853
-
WAU - LAE ROAD, NEW GUINEA, 1944-02-20. A SUSPENSION BRIDGE NEAR THE WATUT RIVER JUNCTION ABOUT ...
Photograph
WAU - LAE ROAD, NEW GUINEA, 1944-02-20. A SUSPENSION BRIDGE NEAR THE WATUT RIVER JUNCTION ABOUT 25 MILES FROM WAU. THE ROADWAY AT THIS POINT IS BUILT ON DREDGE CASTINGS.070859
-
WAU - LAE ROAD, NEW GUINEA, 1944-02-26. THE ROAD IS 35 MILES FROM WAU, CROSSING A CULVERT AND ...
Photograph
WAU - LAE ROAD, NEW GUINEA, 1944-02-26. THE ROAD IS 35 MILES FROM WAU, CROSSING A CULVERT AND SUSPENSION BRIDGE OVER THE SNAKE RIVER. THE ROAD AT THIS POINT IS MAINTAINED BY THE 1ST MECHANICAL EQUIPME...070913
-
WAU - LAE ROAD, NEW GUINEA, 1944-02-26. TWENTY FIVE MILES FROM WAU A NEW BRIDGE BEING CONSTRUCTED ...
Photograph
WAU - LAE ROAD, NEW GUINEA, 1944-02-26. TWENTY FIVE MILES FROM WAU A NEW BRIDGE BEING CONSTRUCTED ACROSS THE BAIME CREEK A FEW HUNDRED YARDS FROM THE WATUT RIVER. SPANNING 32 FEET IT CONSISTS OF HARDW...070900
-
WEWAK AREA, NEW GUINEA. 1945-05-30. MEMBERS OF 2/2 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS AND ...
Photograph
WEWAK AREA, NEW GUINEA. 1945-05-30. MEMBERS OF 2/2 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS AND 2/8 INFANTRY BATTALION USING A BULLDOZER TO CLEAR DEBRIS AND MUD DURING PREPARATIONS TO BRIDGE A CREEK. ...092708
-
WEWAK AREA, NEW GUINEA, 1945-06-09. SAPPERS WORKING WITH 2/8 INFANTRY BATTALION, UP TO THEIR ...
Photograph
WEWAK AREA, NEW GUINEA, 1945-06-09. SAPPERS WORKING WITH 2/8 INFANTRY BATTALION, UP TO THEIR ARMPITS IN WATER, FIXING A CRIB JETTY BEFORE THEY PUT THE FINAL BRIDGE IN PLACE. BRIDGE BUILDING IS A PROBL...092994
-
WEWAK POINT, NEW GUINEA, 1945-05-12. THE 25-POUNDER OF 2/2 FIELD REGIMENT, ROYAL AUSTRALIAN ARMY, ...
Photograph
WEWAK POINT, NEW GUINEA, 1945-05-12. THE 25-POUNDER OF 2/2 FIELD REGIMENT, ROYAL AUSTRALIAN ARMY, MOVING OVER THE BRIDGE OVER MINGA CREEK ON THE ROAD TO WEWAK POINT. THIS BRIDGE WAS BUILT BY 2/8 FIELD...092013
-
WONGABEL AREA, ATHERTON TABLELAND, QLD. 1944-10-24. A GIRDER APPROACHING THE FOREMOST ROLLER ...
Photograph
WONGABEL AREA, ATHERTON TABLELAND, QLD. 1944-10-24. A GIRDER APPROACHING THE FOREMOST ROLLER DURING CONSTRUCTION OF A BOX GIRDER BRIDGE MK III BY PERSONNEL OF NO. 3 PLATOON, 24 FIELD COMPANY, ROYAL AU...081820
-
WONGABEL AREA, ATHERTON TABLELAND, QLD. 1944-10-24. A MK II "STEELE" BRIDGE CONSTRUCTED BY ...
Photograph
WONGABEL AREA, ATHERTON TABLELAND, QLD. 1944-10-24. A MK II "STEELE" BRIDGE CONSTRUCTED BY PERSONNEL OF 24 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS, VIEWED FROM THE PLATFORM OF THE GANTRY. THE BRIDGE...081818
-
WONGABEL AREA, ATHERTON TABLELAND, QLD. 1944-10-24. MECHANICS OF 24 FIELD COMPANY, ROYAL ...
Photograph
WONGABEL AREA, ATHERTON TABLELAND, QLD. 1944-10-24. MECHANICS OF 24 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS, OVERHAULING CATERPILLAR R 4 TRACTORS USED FOR HAULING TIMBER FOR BRIDGES AND IN THE MOVEM...081817
-
WONGABEL AREA, ATHERTON TABLELAND, QLD. 1944-10-24. PERSONNEL OF NO. 1 PLATOON, 24 FIELD COMPANY, ...
Photograph
WONGABEL AREA, ATHERTON TABLELAND, QLD. 1944-10-24. PERSONNEL OF NO. 1 PLATOON, 24 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS, ERECTING A "STEELE" BRIDGE MK II WITH THE AID OF A GANTRY. IDENTIFIED PERS...081823
-
WONGABEL AREA, ATHERTON TABLELAND, QLD. 1944-10-24. PERSONNEL OF NO. 1 PLATOON, 24 FIELD COMPANY, ...
Photograph
WONGABEL AREA, ATHERTON TABLELAND, QLD. 1944-10-24. PERSONNEL OF NO. 1 PLATOON, 24 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS, ERECTING A "STEELE" BRIDGE MK II WITH THE USE OF A GANTRY.081822
-
WONGABEL AREA, ATHERTON TABLELAND, QLD. 1944-10-24. TROOPS OF 24 FIELD COMPANY, ROYAL AUSTRALIAN ...
Photograph
WONGABEL AREA, ATHERTON TABLELAND, QLD. 1944-10-24. TROOPS OF 24 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS, ADJUST CHOCKS AS A STEELE MK II BRIDGE IS SWUNG INTO POSITION. THE CHOCKS UNDER THE PIVOT WH...081989
-
WONGABEL AREA, QUEENSLAND. 1945-02-15. THE DUKE OF GLOUCESTER, GOVERNOR-GENERAL OF AUSTRALIA, ...
Photograph
WONGABEL AREA, QUEENSLAND. 1945-02-15. THE DUKE OF GLOUCESTER, GOVERNOR-GENERAL OF AUSTRALIA, (2), ACCOMPANIED BY BRIGADIER R.J.H. RISSON, CE 1 CORPS, (3), EXAMINES A "STEELE" BRIDGE BEFORE IT IS SWUN...087510
-
WONGABEL AREA, QUEENSLAND. 1945-02-15. THE DUKE OF GLOUCESTER, GOVERNOR-GENERAL OF AUSTRALIA, ...
Photograph
WONGABEL AREA, QUEENSLAND. 1945-02-15. THE DUKE OF GLOUCESTER, GOVERNOR-GENERAL OF AUSTRALIA, (1), ACCOMPANIED BY MEMBERS OF THE OFFICIAL PARTY, MOVES ALONG AN ARC MESH TRACK FOLLOWING EXAMINATION OF ...087511
-
WONGABEL, ATHERTON AREA. 1944-10-24. PERSONNEL OF 24 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS, ...
Photograph
WONGABEL, ATHERTON AREA. 1944-10-24. PERSONNEL OF 24 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS, PUSHING A STEELE MK II BRIDGE INTO POSITION DURING CONSTRUCTION.081987
-
WONGABEL, ATHERTON AREA. 1944-10-24. THE LAUNCHING GEAR ON A STEELE MK II BRIDGE UNDER ...
Photograph
WONGABEL, ATHERTON AREA. 1944-10-24. THE LAUNCHING GEAR ON A STEELE MK II BRIDGE UNDER CONSTRUCTION BY 24 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS. THE BRIDGE PIVOTS ON THE RIGHT HAND WHEEL WHILST TH...081986
-
WONGABEL, QLD. 1944-11-09. LANCE-CORPORAL K. WAINWRIGHT, FIELD COMPANY, USING AN AIR COMPRESSOR ...
Photograph
WONGABEL, QLD. 1944-11-09. LANCE-CORPORAL K. WAINWRIGHT, FIELD COMPANY, USING AN AIR COMPRESSOR SPRAY GUN DESIGNED BY THE UNIT, TO SPRAY CREOSOTE PROTECTION ON THEIR BRIDGE CONSTRUCTION.082885
-
WONGABEL, QLD. 1945-02-15. THE DUKE OF GLOUCESTER, GOVERNOR GENERAL OF AUSTRALIA, (1), ...
Photograph
WONGABEL, QLD. 1945-02-15. THE DUKE OF GLOUCESTER, GOVERNOR GENERAL OF AUSTRALIA, (1), ACCOMPANIED BY SENIOR OFFICERS, INSPECTS A "STEEL" BRIDGE WHILE VISITING 24 FIELD COY, ROYAL AUSTRALIAN ENGINEERS...086738
-
WONGABEL, QLD. 1944-11-10. TROOPS OF 2 FIELD COMPANY, ASSISTED BY A TRACTOR, ATTEMPT THE REMOVAL ...
Photograph
WONGABEL, QLD. 1944-11-10. TROOPS OF 2 FIELD COMPANY, ASSISTED BY A TRACTOR, ATTEMPT THE REMOVAL OF THE CENTRE GIRDER OF A BUILT UP COMMERCIAL GIRDER BRIDGE. THE REMOVAL OF THE GIRDER REQUIRED THE USE...083044
-
WONGABEL, QLD. 1944-11-10. TROOPS OF 2 FIELD COMPANY AT WORK ON A BRIDGE NEARING COMPLETION.
Photograph
WONGABEL, QLD. 1944-11-10. TROOPS OF 2 FIELD COMPANY AT WORK ON A BRIDGE NEARING COMPLETION.082886
-
WONGABEL, QLD. 1944-11-10. TROOPS OF 2 FIELD COMPANY ERECTING A PORTABLE PILE DRIVER DESIGNED BY ...
Photograph
WONGABEL, QLD. 1944-11-10. TROOPS OF 2 FIELD COMPANY ERECTING A PORTABLE PILE DRIVER DESIGNED BY THE UNIT. IT IS BEING USED IN THE ERECTION OF A PERMANENT 4-SPAN WOODEN PILE TRESTLE BRIDGE REPLACING A...082888
-
WONGABEL, QLD. 1944-11-10. TROOPS OF 2 FIELD COMPANY HAULING LOGS FROM A TIMBER WAGON. THE LOGS, ...
Photograph
WONGABEL, QLD. 1944-11-10. TROOPS OF 2 FIELD COMPANY HAULING LOGS FROM A TIMBER WAGON. THE LOGS, SAWN BY THE UNIT, WILL BE USED AS BRIDGE PILES.083043
-
WONGABEL, QLD. 1944-11-10. TWO TRACTORS OPERATED BY PERSONNEL OF 2 FIELD COMPANY, HAUL THE CENTRE ...
Photograph
WONGABEL, QLD. 1944-11-10. TWO TRACTORS OPERATED BY PERSONNEL OF 2 FIELD COMPANY, HAUL THE CENTRE GIRDER DURING THE CONSTRUCTION OF A COMMERCIAL BUILT UP GIRDER BRIDGE.083045
-
WONGABEL, QUEENSLAND. 1944-12-15. A MEMBER OF THE 2 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS, ...
Photograph
WONGABEL, QUEENSLAND. 1944-12-15. A MEMBER OF THE 2 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS, STANDS BETWEEN THE DIAGONAL TUBES OF A "STEELE" BRIDGE. THE BRIDGE, MEASURING 84 FEET, CAN BE ERECTED BY ...084281
-
WONGABEL, QUEENSLAND. 1944-12-15. 2 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS TROOPS ALONGSIDE ...
Photograph
WONGABEL, QUEENSLAND. 1944-12-15. 2 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS TROOPS ALONGSIDE THE WHEELS OF THE LAUNCHING TROLLEY ON WHICH A "STEELE" BRIDGE PIVOTS WHEN IT IS POSITIONED. THE BRIDGE, ...084278
-
WONGABEL, QUEENSLAND. 1944-12-15. 2 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS TROOPS ALONGSIDE A ...
Photograph
WONGABEL, QUEENSLAND. 1944-12-15. 2 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS TROOPS ALONGSIDE A "STEELE" BRIDGE AFTER IT HAD BEEN LAUNCHED INTO POSITION. THE BRIDGE, MEASURING 84 FEET, CAN BE ERECTED...084279
-
WONGABEL, QUEENSLAND. 1944-12-15. 2 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS TROOPS SWING A ...
Photograph
WONGABEL, QUEENSLAND. 1944-12-15. 2 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS TROOPS SWING A "STEELE" BRIDGE INTO POSITION. THE BRIDGE, LAUNCHED ON A TROLLEY FROM WHICH IT PIVOTS, MEASURES 84 FEET WIT...084276
-
WONGABEL, QUEENSLAND. 1944-12-15. 2 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS TROOPS SWING A ...
Photograph
WONGABEL, QUEENSLAND. 1944-12-15. 2 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS TROOPS SWING A "STEELE" BRIDGE INTO POSITION. THE BRIDGE CAN BE ERECTED BY A PLATOON OF ENGINEERS IN 8 HOURS.084277
-
WUNUNG PLANTATION, NEW BRITAIN. 1944-12-30. TROOPS OF THE 13TH FIELD COMPANY, BUILDING A BRIDGE ...
Photograph
WUNUNG PLANTATION, NEW BRITAIN. 1944-12-30. TROOPS OF THE 13TH FIELD COMPANY, BUILDING A BRIDGE ACROSS THE WUNUNG RIVER. LEFT TO RIGHT: SAPPER MCGELLIN (1); SAPPER KING (2); SAPPER BOOKER (3); CORPORA...077984
-
WUNUNG PLANTATION, NEW BRITAIN. 1944-12-30. TROOPS OF THE 13TH FIELD COMPANY, ERECTING TIMBER ...
Photograph
WUNUNG PLANTATION, NEW BRITAIN. 1944-12-30. TROOPS OF THE 13TH FIELD COMPANY, ERECTING TIMBER STRINGERS FOR A NEW BRIDGE ACROSS THE WUNUNG RIVER. IDENTIFIED PERSONNEL ARE: SAPPER KING (1); LANCE SERGE...077985
-
YAMIL 2, NEW GUINEA, 1945-07-23. THE ROAD MAINTAINED BY 2/4 FIELD COMPANY, ROYAL AUSTRALIAN ...
Photograph
YAMIL 2, NEW GUINEA, 1945-07-23. THE ROAD MAINTAINED BY 2/4 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS, WHICH IS THE FINAL LINK BETWEEN YAMIL AND MAPRIK, ON A RIDGE RUNNING FROM YAMIL 3 TO YAMIL 2. THE...094539
-
YAULA, NEW GUINEA. 1944-04-09. MEMBERS OF THE 2ND MOUNTAIN BATTERY, READING MAIL AND CLEANING ...
Photograph
YAULA, NEW GUINEA. 1944-04-09. MEMBERS OF THE 2ND MOUNTAIN BATTERY, READING MAIL AND CLEANING WEAPONS OUTSIDE A MAKESHIFT HUT CONSTRUCTED WITH A ROOF TOP OF BANANA LEAVES. THE UNIT IS ENGAGED IN THE 5...072276
-
YUNNAN PROVINCE, CHINA. 1942-02. A CONVOY OF TRUCKS FROM THE AUSTRALIAN CONTINGENT TO THE BRITISH ...
Photograph
YUNNAN PROVINCE, CHINA. 1942-02. A CONVOY OF TRUCKS FROM THE AUSTRALIAN CONTINGENT TO THE BRITISH MILITARY MISSION 204 WAITS TO CROSS THE SUSPENSION BRIDGE ACROSS THE SALWEEN GORGE BEFORE CLIMBING UP ...P00767.013
-
ZENAG, NEW GUINESA, 1944-02-28. A BRIDGE UNDER CONSTRUCTION SPANNING THE PURINEN RIVER 59 MILES ...
Photograph
ZENAG, NEW GUINESA, 1944-02-28. A BRIDGE UNDER CONSTRUCTION SPANNING THE PURINEN RIVER 59 MILES FROM WAU.070970