Filters
Filters (4 applied)
Clear All- has image : yes (remove)
- related places : Oceania: Pacific Islands, Solomon Islands, Bougainville, South Bougainville (remove)
- related subjects : Bridge construction (remove)
- type : Photograph (remove)
-
has sound (1)
-
has video (1)
-
Conflict (1)
Collection
15 Results
-
BOUGAINVILLE. 1945-07-18. A JEEP AND TRAILER LOADED WITH ENGINEERS OF 15 FIELD COMPANY, ROYAL ...
Photograph
BOUGAINVILLE. 1945-07-18. A JEEP AND TRAILER LOADED WITH ENGINEERS OF 15 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS, AND STORES, FORDING THE OGORATA RIVER. THE ENGINEERS FOLLOW IN THE WAKE OF THE ADVAN...094166
-
BOUGAINVILLE. 1945-05-30. PATROL GRADER AND JEEP CROSSING THE TUJU BRIDGE CONSTRUCTED BY MEMBERS ...
Photograph
BOUGAINVILLE. 1945-05-30. PATROL GRADER AND JEEP CROSSING THE TUJU BRIDGE CONSTRUCTED BY MEMBERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS. THE BRIDGE IS ON THE COAST ROAD FROM TOKO TO TOROKINA, ...092673
-
BOUGAINVILLE. 1945-05-30. THE SAVIGE BRIDGE CONSTRUCTED BY 11 FIELD COMPANY ROYAL AUSTRALIAN ...
Photograph
BOUGAINVILLE. 1945-05-30. THE SAVIGE BRIDGE CONSTRUCTED BY 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, OVER THE JABA RIVER. THIS BRIDGE, MEASURING 620 FEET LONG AS A GUARD AGAINST FLOOD WATERS, OPENS...092669
-
BOUGAINVILLE. 1945-05-30. VEHICLES OF 2/11 FIELD REGIMENT, ROYAL AUSTRALIAN ENGINEERS, CROSSING ...
Photograph
BOUGAINVILLE. 1945-05-30. VEHICLES OF 2/11 FIELD REGIMENT, ROYAL AUSTRALIAN ENGINEERS, CROSSING THE NEWLY CONSTRUCTED SAVIGE BRIDGE OVER THE JABA RIVER. THIS BRIDGE, MEASURING 620 FEET LONG AS A GUARD...092670
-
SOUTH BOUGAINVILLE. 1945-07-20. A CONVENANTER BRIDGE BUILDING TANK OF 2/4 ARMOURED REGIMENT, ...
Photograph
SOUTH BOUGAINVILLE. 1945-07-20. A CONVENANTER BRIDGE BUILDING TANK OF 2/4 ARMOURED REGIMENT, LAYING A 32-FOOT SPAN OVER A ROAD WASH-AWAY BETWEEN THE OGORATA AND MOBIAI RIVERS TO ALLOW URGENTLY REQUIRE...094221
-
SOUTH BOUGAINVILLE. 1945-07-20. A COVENANTER BRIDGE BUILDING TANK OF 2/4 ARMOURED REGIMENT, ...
Photograph
SOUTH BOUGAINVILLE. 1945-07-20. A COVENANTER BRIDGE BUILDING TANK OF 2/4 ARMOURED REGIMENT, LAYING A 32-FOOT SPAN OVER A ROAD WASH-AWAY BETWEEN THE OGORATA AND MOBIAI RIVERS TO ALLOW URGENTLY REQUIRED...094222
-
SOUTH BOUGAINVILLE. 1945-07-20. A COVENANTER BRIDGE BUILDING TANK OF 2/4 ARMOURED REGIMENT, ...
Photograph
SOUTH BOUGAINVILLE. 1945-07-20. A COVENANTER BRIDGE BUILDING TANK OF 2/4 ARMOURED REGIMENT, LAYING A 32-FOOT SPAN OVER A ROAD WASH-AWAY BETWEEN THE OGORATA AND MOBIAI RIVERS TO ALLOW URGENTLY REQUIRED...094220
-
SOUTH BOUGAINVILLE, 1945-05-27. ENGINEERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, WORKING ...
Photograph
SOUTH BOUGAINVILLE, 1945-05-27. ENGINEERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, WORKING ON THE SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER. CONSTRUCTED IN FIVE WEEKS, THE BRIDGE MEASURES 620 FEE...092594
-
SOUTH BOUGAINVILLE. 1945-05-27. MEMBERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, ...
Photograph
SOUTH BOUGAINVILLE. 1945-05-27. MEMBERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, CONSTRUCTING SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER. PILE DRIVING FRAMES MOUNTED ON PONTOON RAFTS ARE AT WORK B...092592
-
SOUTH BOUGAINVILLE, 1945-05-27. THE SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER ALMOST COMPLETED. ...
Photograph
SOUTH BOUGAINVILLE, 1945-05-27. THE SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER ALMOST COMPLETED. CONSTRUCTED BY MEMBERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, IT WAS COMPLETED IN FIVE WEEKS AND ...092599
-
SOUTH BOUGAINVILLE, 1945-05-27. THE SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER ALMOST COMPLETED. ...
Photograph
SOUTH BOUGAINVILLE, 1945-05-27. THE SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER ALMOST COMPLETED. CONSTRUCTED BY MEMBERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, IT WAS COMPLETED IN FIVE WEEKS AND ...092596
-
SOUTH BOUGAINVILLE, 1945-05-27. THE SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER ALMOST COMPLETED. ...
Photograph
SOUTH BOUGAINVILLE, 1945-05-27. THE SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER ALMOST COMPLETED. CONSTRUCTED BY MEMBERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, IT WAS COMPLETED IN FIVE WEEKS AND ...092598
-
SOUTH BOUGAINVILLE, 1945-05-27. THE SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER ALMOST COMPLETED. ...
Photograph
SOUTH BOUGAINVILLE, 1945-05-27. THE SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER ALMOST COMPLETED. CONSTRUCTED BY MEMBERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, IT WAS COMPLETED IN FIVE WEEKS AND ...092595
-
SOUTH BOUGAINVILLE. 1945-05-27. THE SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER NEARING COMPLETION. ...
Photograph
SOUTH BOUGAINVILLE. 1945-05-27. THE SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER NEARING COMPLETION. CONSTRUCTED BY MEMBERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, IN FIVE WEEKS, THE BRIDGE MEASURE...092593
-
SOUTH BOUGAINVILLE. 1945-07-24. TROOPS OF 2/4 ARMOURED REGIMENT CONSTRUCTING A TEMPORARY BRIDGE ...
Photograph
SOUTH BOUGAINVILLE. 1945-07-24. TROOPS OF 2/4 ARMOURED REGIMENT CONSTRUCTING A TEMPORARY BRIDGE OVER A ROAD WASHAWAY ON THE BUIN ROAD, EAST OF THE OGORATA RIVER. THE MATILDA TANK, "BULLECOURT", AT THE...094452