Filters
Filters (5 applied)
Clear All- has sound : no (remove)
- maker : Frazer, Alton Lyall (remove)
- related places : Oceania: New Guinea1, Papua New Guinea, Morobe Province, Lae (remove)
- related units : 2/8 Australian General Hospital (remove)
- type : Photograph (remove)
-
has image (1)
-
has video (1)
-
Conflict (1)
Collection
3 Results
-
LAE, NEW GUINEA. 1944-04-01. A NEW DYSENTERY WARD BUILT BY THE ROYAL AUSTRALIAN ENGINEERS, ...
Photograph
Maker: Frazer, Alton Lyall
LAE, NEW GUINEA. 1944-04-01. A NEW DYSENTERY WARD BUILT BY THE ROYAL AUSTRALIAN ENGINEERS, HEADQUARTERS LAE BASE SUB AREA, FOR THE 2/8TH AUSTRALIAN GENERAL HOSPITAL.071980
-
LAE, NEW GUINEA. 1944-04-01. THE PUMPING PLANT USED TO PUMP WATER FROM THE DAM AT THE 2/7TH AND ...
Photograph
Maker: Frazer, Alton Lyall
LAE, NEW GUINEA. 1944-04-01. THE PUMPING PLANT USED TO PUMP WATER FROM THE DAM AT THE 2/7TH AND 2/8TH GENERAL HOSPITALS AND INSTALLED BY PERSONNEL OF THE ROYAL AUSTRALIAN ENGINEERS, HEADQUARTERS LAE B...071976
-
LAE, NEW GUINEA. 1944-04-01. THE STORAGE BASIN AT THE FOREGROUND HOLDING 900,000 GALLONS OF ...
Photograph
Maker: Frazer, Alton Lyall
LAE, NEW GUINEA. 1944-04-01. THE STORAGE BASIN AT THE FOREGROUND HOLDING 900,000 GALLONS OF WATER, AND ASSISTED BY THE PUMPING PLANT IN THE BACKGROUND PROVIDES WATER TO THE 2/7TH AND 2/8TH GENERAL HOS...071977