Filters
Filters (3 applied)
Clear All- related subjects : Generators (remove)
- related units : Headquarters signals (remove)
- type : Photograph (remove)
-
has image (1)
-
has sound (1)
-
has video (1)
-
Conflict (1)
-
related places (7)
- Asia: Netherlands East Indies, Halmahera Island, Morotai Island (6)
- Oceania: Australia, Queensland, North Queensland, Atherton Tableland, Atherton (2)
- Oceania: Australia, Queensland, North Queensland, Barrine (2)
- Oceania: New Guinea1, Papua New Guinea, Morobe Province, Lae (2)
- Oceania: Australia, Victoria, Digger's Rest (1)
- Oceania: New Guinea1 (1)
- Oceania: New Guinea1, Wewak Madang Area, Madang Area, Mililat (1)
Collection
12 Results
-
BARRINE, QLD. 1944-07-20. A JEEP AND TRAILER OF THE 133RD HEAVY WIRELESS DETACHMENT HEADQUARTERS, ...
Photograph
BARRINE, QLD. 1944-07-20. A JEEP AND TRAILER OF THE 133RD HEAVY WIRELESS DETACHMENT HEADQUARTERS, "A" AUSTRALIAN CORPS OF SIGNALS LOADED WITH RECEIVING AND REMOTE CONTROL EQUIPMENT, CABLE LAYING EQUIP...068135
-
BARRINE, QLD. 1944-07-20. A JEEP AND TRAILER OF THE 133RD HEAVY WIRELESS DETACHMENT HEADQUARTERS, ...
Photograph
BARRINE, QLD. 1944-07-20. A JEEP AND TRAILER OF THE 133RD HEAVY WIRELESS DETACHMENT HEADQUARTERS, "A" AUSTRALIAN CORPS OF SIGNALS LOADED WITH RECEIVING AND REMOTE CONTROL EQUIPMENT, CABLE LAYING EQUIP...068134
-
DIGGERS REST, VIC. 1945-09-11. THE DIESEL MOTOR AND GENERATORS WHICH SUPPLY AUXILIARY POWER AT ...
Photograph
DIGGERS REST, VIC. 1945-09-11. THE DIESEL MOTOR AND GENERATORS WHICH SUPPLY AUXILIARY POWER AT LAND HEADQUARTERS SIGNALS, DIGGERS REST.115352
-
LAE AREA, NEW GUINEA. 1945-02-06. ONE OF THE TWO 25KVA ELECTRICITY GENERATING SETS AT THE ...
Photograph
LAE AREA, NEW GUINEA. 1945-02-06. ONE OF THE TWO 25KVA ELECTRICITY GENERATING SETS AT THE WIRELESS TRANSMITTING CENTRE OF THE 19TH LINES OF COMMUNICATION SIGNALS, HEADQUARTERS, FIRST AUSTRALIAN ARMY.078904
-
LAE, NEW GUINEA. 1945-03-11. A SIGNALLER CHECKING TEST EQUIPMENT AT HEADQUARTERS, 19TH LINES OF ...
Photograph
LAE, NEW GUINEA. 1945-03-11. A SIGNALLER CHECKING TEST EQUIPMENT AT HEADQUARTERS, 19TH LINES OF COMMUNICATION SIGNALS. EQUIPMENT IS LEFT TO RIGHT:- BELOW: RECEPTION SET NO.4; VALVE AND CONDENSER TESTE...079387
-
MILILAT, NEW GUINEA. 1944-07-16. SIGNALS PERSONNEL OF HEADQUARTERS, 5TH DIVISION TESTING THE ...
Photograph
MILILAT, NEW GUINEA. 1944-07-16. SIGNALS PERSONNEL OF HEADQUARTERS, 5TH DIVISION TESTING THE POWER GENERATING PLANT OF A CAPTURED JAPANESE MODEL 94, TYPE 2, 300 WATT, RADIO TRANSMITTER.074804
-
MOROTAI, 1945-05-13. A 133 WIRELESS STATION WITH POWER TAKE-OFF GENERATOR MOUNTED IN A JEEP; ...
Photograph
MOROTAI, 1945-05-13. A 133 WIRELESS STATION WITH POWER TAKE-OFF GENERATOR MOUNTED IN A JEEP; CHIEF SIGNALS OFFICE BRANCH, HQ 1 CORPS.108071
-
MOROTAI, 1945-05-13. A 133 WIRELESS STATION WITH POWER TAKE-OFF GENERATOR MOUNTED IN A JEEP; ...
Photograph
MOROTAI, 1945-05-13. A 133 WIRELESS STATION WITH POWER TAKE-OFF GENERATOR MOUNTED IN A JEEP; CHIEF SIGNALS OFFICE BRANCH, HQ 1 CORPS.108069
-
MOROTAI. 1945-05-17. MEMBERS OF ADVANCED LAND HEADQUARTERS SIGNALS WORKING IN THE LOCALITY OF A ...
Photograph
MOROTAI. 1945-05-17. MEMBERS OF ADVANCED LAND HEADQUARTERS SIGNALS WORKING IN THE LOCALITY OF A TEMPORARY TRANSMITTER TENT WITH A 25 KVA GENERATOR.092127
-
MOROTAI. 1945-10-15. THE ELECTRICITY GENERATING TRUCK WITH COUPLED GENERATING SETS AT THE SIGNALS ...
Photograph
MOROTAI. 1945-10-15. THE ELECTRICITY GENERATING TRUCK WITH COUPLED GENERATING SETS AT THE SIGNALS OFFICE, ADVANCED LAND HQ.117744
-
MOROTAI. 1945-05-17. THE POWER ROOM SUPPLYING POWER FOR THE SIGNALS OFFICE, ADVANCED LAND ...
Photograph
MOROTAI. 1945-05-17. THE POWER ROOM SUPPLYING POWER FOR THE SIGNALS OFFICE, ADVANCED LAND HEADQUARTERS SIGNALS. MECHANICS ARE WORKING ON HOWARD GENERATORS.092129
-
MOROTAI. 1945-10-15. THE POWER SWITCHBOARD WHICH HANDLES THE LINES FROM THE 5KVA ELECTRICITY ...
Photograph
MOROTAI. 1945-10-15. THE POWER SWITCHBOARD WHICH HANDLES THE LINES FROM THE 5KVA ELECTRICITY GENERATING SETS IN THE SIGNALS OFFICE, ADVANCED LAND HQ.117743